Case Study · Housing · Porto and Braga

Quantities evidenced before the invoice arrives.

How CLK Engenharia in Portugal records quantities, construction progress and concealed work with the 360° walkthrough – week after week, across several sites at once.

Building shell of a residential building in Porto in a 360° walkthrough
The same building shell as a 3D model from the walkthrough

Building shell in Porto: the walkthrough of 17 June as a 360° image and a 3D model you can measure.

Results

10 h → 2 h
Site measurement per billing stage
5
Construction sites at the same time in Plonda
1 ×
Walkthrough per week and construction site

Starting point.

An interim payment application is submitted every month, and every item needs evidence. Previously this meant plans, phone photos and on-site measurements, often weeks after the work was completed. Work hidden behind suspended ceilings or screed could hardly be documented afterwards.

Use of Plonda.

Once a week, a site manager walks through each site with the 360° camera. Plonda records the condition and date, builds a 3D model in which areas can be measured, and links quantities to the bill-of-quantities items.

Conduits and cables at the structural ceiling before the suspended ceiling is closed up
Electrical first-fix installation at the ceiling, recorded before the suspended ceiling conceals it.

Extract from the bill of quantities

9.2.2.1Interior wall painting, white3,326.71 m²
9.3.2.1Interior ceiling painting2,363.00 m²
2.1.2.6Thermoblock interior wall, 15 cm243.18 m²
14.4Chases and openings, all tradesLump sum

Original items from one project's bill of quantities, translated.

Result.

Measurements for a billing stage are taken at the desk instead of on site. Quantity discrepancies are found before approval rather than at the final invoice. And when a variation is disputed, the walkthrough from that day provides the evidence.

José Sá Machado
“With Plonda I go back in the walkthrough to the day the work was carried out and measure it. That ends most discussions before they begin.”

José Sá Machado, CLK – Construção e Engenharia · translated from Portuguese