What are we owed?

Interim payment application backed by evidence.

Quantities and progress straight from the 360° walkthrough – measurable, located and backed by images. For everyone who bills and everyone who checks invoices.

Interim payment application No. 4 · Ground floorActual construction plan and bill-of-quantities items from a pilot project; illustrative progress data.
■ done■ in progress■ open□ not part of the item

0.11 Living/kitchen · complete · net wall area 46 m² · walkthrough of 24 Sept. · Open evidence in the walkthrough →

Cases

Two sides of the same invoice.

Interim payment application with evidence

Situation
End of the month, interim payment application no. 4 to the general contractor.
Today
Progress estimated, photos sent later, the client deducts “pending review” – the money arrives weeks later.
With Plonda
Item 9.2.2.1 “Interior wall painting” with evidenced area per room and a link to the walkthrough. This is the verifiable statement required by § 16 VOB/B. Areas are obtained from the room with a click: net walls, ceiling and floor, openings deducted and reveals listed individually – without a folding ruler.
Floor plan in the 3D model with detected rooms and areas

Work that disappears

Situation
Concrete walls poured, wiring installed, waterproofing laid – next week it will all be covered.
Today
Whoever argues about it later has a few phone photos without a location.
With Plonda
The condition before concealment is evidenced with a date and location – the basis when a joint condition assessment under § 4 Abs. 10 VOB/B is requested.
Conduits and cables at the structural ceiling, before the suspended ceiling is closed up

Assign items to the bill of quantities automatically

Situation
The bill of quantities is available as a GAEB, Excel or PDF file – with thousands of square metres of painting, masonry and ceilings.
Today
Quantities are assigned to items by hand.
With Plonda
Import the bill of quantities, link items to rooms and elements; every new walkthrough updates progress per item.
Extract from an actual bill of quantities · Housing, 6 floors
9.2.2.1Interior wall painting, white3,326.71 m²62 % evidenced
9.3.2.1Interior ceiling painting2,363.00 m²38 % evidenced
2.1.2.6Thermoblock interior wall, 15 cm243.18 m²done
14.4Chases and openings, all tradesLump sumEvidenced at each location

Original items from a pilot project's bill of quantities, translated; illustrative progress data. Each new walkthrough updates progress for every item.

Results from first projects

Ten hours of measuring become two.

Per billing stage: a 360° walkthrough instead of measuring on site, wall areas detected automatically, evidence linked directly.

Practical example: CLK Engenharia →

Today

  • Measure on site
  • Calculate m²
  • Assign photos / evidence
≈ 10 h per billing stage

With Plonda

  • Record a 360° walkthrough
  • Detect wall areas automatically
  • Link m² directly to evidence
≈ 2 h per billing stage
Savings per billing stage≈ 8 h
Across 10 billing stages≈ 80 h
At €75/h≈ €6,000Potential per project

Only direct time savings are included. Figures from initial pilot projects; later available as a calculator using your own figures.

Why it matters

Verifiable billing gets paid faster.

§ 16 VOB/B

Interim payments require a verifiable statement that allows the work to be assessed quickly and reliably.

likewise § 632a German Civil Code
15 days

is how late construction customers pay on average – twice as long as across all industries.

Creditreform, Q1 2026
40 %

of their working time is what site engineers spend on billing.

TU Wien 2015, diploma thesis, eight civil engineering sites in Austria

Frequently asked questions

What site managers ask us first.

Does Plonda recognise windows, doors and reveals?

Yes. Openings are deducted, reveals are listed separately.

Will my client accept it?

They do not have to take our word for it: every quantity has a location, date and image, and a shared link lets them measure it themselves without logging in. Whether they accept the statement as verifiable remains their decision.

Can we import our bill of quantities as GAEB?

Yes. Plonda reads GAEB files (X83, X84, X86) and a CSV template that you save directly from Excel.

Which trades benefit?

Wherever billing uses area, volume or item counts: painting, drywall, plaster, tiling and flooring use room areas; demolition and earthworks use stockpiles; first-fix installation provides evidence before concealment.

See Plonda on your project.

Send us a walkthrough – we will show you the result on your own site.